I-75 Managed Lanes, From NW 170th Street in Miami-Dade County to I-595 in Broward County, FL: GCME is part of the I-75 Managed Lanes Corridor Design Consultant Team (as Geotechnical Sub-consultant), performing all the following tasks for five (5) Segments of I-75 Design Build Projects in Florida
The field exploration program consisting of Bridge Borings, Retaining & Sound Barrier Wall Borings, Roadway Borings and Muck Evaluation for the following Segments:
- Segment A: From NW 170th Street to South of HEFT, Miami-Dade County
- Segment B: From South of HEFT to South Miramar Parkway, Miami-Dade & Broward Counties
- Segment C: From South of Miramar Parkway to South of Sheridan Street, Broward County
- Segment D: From South of Sheridan Street to North of Griffin Road, Broward County
- Segment E: From North of Griffin Road to Interstate I-595
Preparation of the RFP & Documents for all five (5) Segments
Review & Evaluation of ELOIs submitted by Design Build Teams, and provide engineering input to the FDOT TRC members
Review & Evaluation of the Technical Proposals submitted by the shortlisted Design Build Teams, and provide engineering input to the FDOT TRC members